Install CGC Field for a full-screen app that works offline.
Keep your forms safe on this device even when unused — turn on storage protection.
CGC
Field Portal
Closure Group Civil Earthmoving
Enter your kiosk code
CGC
TM
Todd Murray
Worker
--:--
Not clocked in
00:00:46
● Synced
Your job today
Project Reborn — Further Scope
CG-2026-001
Safety forms
Machine Issues
Today's submissions
No safety forms submitted yet today
Select your job today
Project Reborn — Further Scope
Active
CG-2026-001 · TBC — confirm with Ryland
Project Levee
Active
CG-2026-002 · TBC — confirm with Ryland
Project Redbull
Active
CG-2026-003 · TBC — confirm with Ryland
Project Silver Stallion
Active
CG-2026-004 · TBC — confirm with Ryland
Project Lilly Pilly
Active
CG-2026-005 · TBC — confirm with Ryland
Project Long Horn
Active
CG-2026-006 · TBC — confirm with Ryland
Donald Trump
Active
CG-2026-007 · TBC — confirm with Ryland
Project Farop
Active
CG-2026-008 · TBC — confirm with Ryland
🚙 CGC Daily Vehicle Inspection
Complete before driving. Any item not Satisfactory must be described — add a photo so the workshop can see it.
Vehicle details
📍 Locating…
Vehicle inspection
Satisfactory ⚠ Defect known ✗ Unsatisfactory
Safety equipment
Trailer inspection
Defects
⛔ STOP — DO NOT DRIVE THIS VEHICLE. Report it to your supervisor and arrange repair before it is used.
Driver declaration
I confirm I have inspected this vehicle and the information recorded is true and correct.
Sign to confirm this inspection.
Clock Out + Docket
JobProject Reborn — Further Scope
Clocked in10:51 am
Breaks0 min
Hours on site0h
Machine hours — required
Read the hour meter before you walk away. This closes the machine off for the day and keeps its service countdown honest.
📋 Supervisor Daily Pre-Start
🚦 What are you pre-starting?
A pre-start is required for every asset you operate this shift — a light vehicle check does not cover a machine, and a machine check does not cover a vehicle. Clock off is blocked until this is done.
🚜 Heavy Plant Pre-Start
Complete before you operate. Any item not Satisfactory must be described — add a photo so the workshop can see it.
Machine & shift
Machine inspection — tap each item
Satisfactory ⚠ Defect known ✗ Unsatisfactory
Defect summary
Declaration
⛔ STOP — DO NOT OPERATE THIS MACHINE. Tag it out, notify your supervisor, and arrange repair before it is used.
Sign to confirm this pre-start is complete and accurate.
✓ Sign off shift summary
Your sign-off
Sign to confirm you have reviewed this record.
📝 Shift Summary
Complete at end of shift. Records finish hours, fuel, and what was achieved.
Hours & fuel
Shift record
Sign to confirm this shift record is accurate.
🔧 Report Machine Fault
⚠️ Incident / Hazard
Leave it as it is if it just happened.
📍 Locating…
✋ CGC TAKE 5
Stop and think through the task. Identify hazards and plan controls before you start. Complete every section.
📍 Locating…
Stop and think through the task
Contact your supervisor if any answer is highlighted.
Hazards and controls
Assessment
Sign to confirm this assessment is complete and accurate.
📊 Workplace Risk Assessment
Use when a risk is NOT already covered by a SWMS, JSA, prestart, or incident report. Complete before starting work in any new area or when conditions change.
Assessment Details
Risk Identification
Existing Controls
Additional Controls Required
Residual Risk Rating
Sign Off
📋 Job Safety Analysis
One row per task step. Each step carries its own hazards and its own controls, so it is clear which control answers which hazard.
Job details
Competency and documents
Task steps and risk assessment
Communication and sign-off
I have read this JSA and the controls are in place.
Signed by the supervisor authorising the work — not by the person completing it.
🚦 Yard & Traffic Inspection
Monthly inspection — yard conditions, traffic movement, plant parking, pedestrian access. Due on the 1st of each month.