Install CGC Field for a full-screen app that works offline.
Keep your forms safe on this device even when unused — turn on storage protection.
CGC
Field Portal
Closure Group Civil Earthmoving
Enter your kiosk code
CGC
TM
Todd Murray
Worker
11:01 AM
Not clocked in
00:00:46
● Synced
Your job today
Project Reborn — Further Scope
CG-2026-001
Safety forms
Machine Issues
Today's submissions
No safety forms submitted yet today
Select your job today
Project Reborn — Further Scope
Active
CG-2026-001 · TBC — confirm with Ryland
Project Levee
Active
CG-2026-002 · TBC — confirm with Ryland
Project Redbull
Active
CG-2026-003 · TBC — confirm with Ryland
Project Silver Stallion
Active
CG-2026-004 · TBC — confirm with Ryland
Project Lilly Pilly
Active
CG-2026-005 · TBC — confirm with Ryland
Project Long Horn
Active
CG-2026-006 · TBC — confirm with Ryland
Donald Trump
Active
CG-2026-007 · TBC — confirm with Ryland
Project Farop
Active
CG-2026-008 · TBC — confirm with Ryland
🚙 CGC Daily Vehicle Inspection
Complete before driving. Any item not Satisfactory must be described — add a photo so the workshop can see it.
Vehicle details
📍 Locating…
Vehicle inspection
Satisfactory ⚠ Defect known ✗ Unsatisfactory
Safety equipment
Trailer inspection
Defects
⛔ STOP — DO NOT DRIVE THIS VEHICLE. Report it to your supervisor and arrange repair before it is used.
Driver declaration
I confirm I have inspected this vehicle and the information recorded is true and correct.
Sign to confirm this inspection.
Clock Out + Docket
JobProject Reborn — Further Scope
Clocked in10:51 am
Breaks0 min
Hours on site0h
📋 Supervisor Daily Pre-Start
🚦 What are you pre-starting?
A pre-start is required for every asset you operate today — a light vehicle check does not cover a machine, and a machine check does not cover a vehicle.
🚜 Heavy Plant Pre-Start
Complete before you operate. Any item not Satisfactory must be described — add a photo so the workshop can see it.
Machine & shift
Machine inspection — tap each item
Satisfactory ⚠ Defect known ✗ Unsatisfactory
Defect summary
Declaration
⛔ STOP — DO NOT OPERATE THIS MACHINE. Tag it out, notify your supervisor, and arrange repair before it is used.
Sign to confirm this pre-start is complete and accurate.
✓ Sign off shift summary
Your sign-off
Sign to confirm you have reviewed this record.
📝 Shift Summary
Complete at end of shift. Records finish hours, fuel, and what was achieved.
Hours & fuel
Shift record
Sign to confirm this shift record is accurate.
🔧 Report Machine Fault
⚠️ Incident / Hazard
✋ CGC TAKE 5
Stop and think through the task. Identify hazards and plan controls before you start. Complete every section.
📍 Locating…
Stop and think through the task
Contact your supervisor if any answer is highlighted.
Hazards and controls
Assessment
Sign to confirm this assessment is complete and accurate.
📊 Workplace Risk Assessment
Use when a risk is NOT already covered by a SWMS, JSA, prestart, or incident report. Complete before starting work in any new area or when conditions change.
Assessment Details
Risk Identification
Existing Controls
Additional Controls Required
Residual Risk Rating
Sign Off
🚦 Yard & Traffic Inspection
Monthly inspection — yard conditions, traffic movement, plant parking, pedestrian access. Due on the 1st of each month.